Done
Fin and bulb weighed
Boat weighed with each of 3 rigs
Check fin draft on limit in fish pond
All strings checked and replaced if necessary - Done last week so I could stretch them in
All sheet settings checked and sheet hook holes marked so sheeting angles are at centre measurement
Rig rakes checked
All fittings checked for any corrosion and screws tightened
Tools and spares made ready for packing
Spare rigs checked for wear.
All batteries charged
To Do
Final run at Frensham tomorrow to check all in order.
Spares
A rig
B rig
Receiver
Servo
Winch (benefit of not building another boat)
Shroud and backstay wire
Cord
bowsies
Deck patches
5 min Epoxy and repair glass fabric.
Yorumlar